IATI and Country Systems: Data Evaluation Methodology

March 17, 2015
Benjamin Arancibia, Hamadoun Cisse, CPA, Paige Kirby, Josh Powell
Aid Effectiveness & Management, Open Data

Last week, we shared big-picture challenges and opportunities our team identified when evaluating IATI data for country-level integration. In this post, we will explain in more detail our data comparison and methodology used to analyze IATI and in-country data.

Step 1: Identifying Core Fields

To begin, we worked to identify data fields that are both commonly used (in reports, dashboards, maps) and commonly required (transaction dates, sectoral information, on/off budget status) in the Aid Management Platform systems and data management plans.

To ensure that data imported from IATI is usable and provides a value-add to the country system dataset, this set of “core” fields became our focus of analysis for data completeness and quality.

Step 2: Determining Data Desirability

Next, we compared aggregate financial data reported by development partners (DPs) to IATI and AMP. This comparison was limited to a historical 2-3 year timeframe, as (i) many DPs began reporting to IATI only recently and (ii) two AMPs (Cote d’Ivoire and Chad) only began in 2014.

This step allowed us to identify (i) which DPs report to IATI but not AMP and (ii) which DPs had significant data gaps between the two systems. We considered IATI data to be desirable for AMP import where it included substantial gains over AMP in financial coverage.

Step 3: Assessing Data Completeness

Thirdly, we calculated the percentage of incomplete (blank) fields across the “core” set for each of the largest IATI reporters. Particular emphasis was placed on transaction fields (e.g. date, currency, transaction type, value). Transactions without dates cannot be imported into AMP, causing IATI reporters with high rates of empty transaction date fields to be excluded from consideration. This represented an initial assessment of import feasibility.

One key challenge was the absence of two frequently required AMP fields from the IATI standard: “On/Off Budget Status” and “National Planning Objectives.”

Step 4: Evaluating Data Timeliness

Fourth, using the IATI Timeliness Dashboard, we determined the frequency with which publishers are updating their data. Priority was given to reporters updating at least quarterly, with annual reporters only being considered for inclusion if (i) no existing AMP data for that reporter is available, or (ii) there is a significant increase in available financial data from IATI over AMP.

This step aimed to ensure that IATI data can be imported into AMP with a similar frequency to the rate at which DP country offices report to the AMP — typically quarterly.

Step 5: Identifying Top Reporters

Based upon the above criteria, we selected a subset of 5 IATI reporters per country to further investigate for import into AMP.

As noted above, the identified reporters tended to be DPs that were entirely absent from AMP, although some exceptions (based on extremely high funding or data quality discrepancies) exist. Timeliness of reporting was also a factor, with DPs who report quarterly (e.g. AfDB) given preference over those reporting annually. For the results of this data analysis, visit last week’s post.

While data consistency, accuracy, and timeliness continue to pose a challenge in both datastreams, this evaluation phase has demonstrated that in-country systems stand to benefit from the addition of IATI data, where quality data exist.

What’s Next?

Phase two of this work will include:

  1. Prepping IATI data for import to AMP by creating field and value mappings between IATI and AMP definitions;
  2. Final development of the new IATI-AIMS Import Tool (including extensive usability testing by country government colleagues) and deployment in all five countries; and
  3. In-person meetings with government and development partner stakeholders to train on the process, perform the data integration, and update country Data Management Plans to incorporate IATI data on a sustainable basis.

Stay tuned for additional updates.

Share This Post

Related from our library

An aerial view of Bogotá, Colombia on the cover of the Data Value Project’s white paper. Photo credit- Bergslay:Pixabay.
Challenging Pessimists—and Optimists—to Reimagine Data and Power

Josh Powell and Jenna Slotin reflect on the Data Values Project and building a movement for change in data for development.

May 10, 2022 Global Data Policy
May 21, 2021 Open Contracting and Procurement Analytics
Scaling Open Contracting in Kenya

Elgeyo Marakwet County in Kenya recently launched their own Open Contracting Portal at the end of April. DG has worked closely with the county to understand the customizations needed in order to meet their needs and has added additional features to the system.

May 18, 2021 Open Contracting and Procurement Analytics